Which project delivery method is NOT discussed in the ExAC?

Prepare for the Examination for Architects in Canada. Study with flashcards and multiple choice questions; each question includes hints and explanations. Get ready for your exam!

The project delivery method that is not discussed in the ExAC is Collaborative Planning. This method, while relevant in the realm of construction and project management, is less commonly recognized as a formal delivery method compared to others like Design-Build, Traditional, and Construction Management at Risk.

Design-Build integrates both design and construction services into one contract, promoting collaboration between designers and builders. The Traditional method, or Design-Bid-Build, separates the design and construction phases, claiming a long-standing tradition in architectural practice. Construction Management at Risk offers a hybrid approach where a construction manager is engaged early in the project, taking responsibility for cost and schedule, which contrasts with more conventional methods.

Collaborative Planning, although it emphasizes teamwork and collaboration among stakeholders, lacks the formal structure and contracts that define recognized project delivery methods. This differentiation is crucial for understanding the range of methodologies used in architecture and construction and how they apply in practical situations.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy